1200 Butte Street Pilot Butte , SK S0G 3Z0

"Never Settle"

1-306-552-5438

1200 Butte Street Pilot Butte , SK S0G 3Z0

"Never Settle"

1-306-552-5438

Soil Stabilization

Stabilize What’s Below.

When unstable soil threatens roads, infrastructure, or structures, advanced polyurethane foam injection helps restore support and improve stability from the ground up.

When the Ground Fails,

EVERYTHING ABOVE IT IS AT RISK.

Soft spots, frost boils, poor compaction, water-saturated soil, and failing subgrades can all lead to settlement and instability.

ECO uses advanced Deep FoamJection™ technology to inject polyurethane foam at predetermined depths, filling problem areas and creating a more stable base beneath the surface.

From highways and parking lots to railway infrastructure, we help restore stability while minimizing disruption to the areas above.

Illustration

ROADS & HIGHWAYS

Repair dips, frost boils, and soft spots without always resorting to extensive excavation and reconstruction. Deep FoamJection™ helps stabilize the soil beneath the road surface and restore support where it is needed.

Illustration

PARKING LOTS

When a parking lot begins to settle, the problem is often beneath the pavement. We use testing and targeted foam injection to identify and stabilize areas where the sub-base has failed.

Illustration

RAILWAYS

Rail infrastructure cannot afford unnecessary downtime. Our Deep FoamJection™ process can help stabilize failing soils and restore support beneath railway infrastructure while reducing the need for lengthy reconstruction.

TEST THE GROUND

UNDERSTAND THE PROBLEM. BUILD THE RIGHT SOLUTION.

Every stabilization project begins with understanding what is happening beneath the surface.
Using Dynamic Cone Penetrometer (DCP) testing, ECO can assess soil density and identify areas where the subgrade may have failed. Testing can then be performed again after the work is complete to help verify the results.

Illustration

Assess. Test. Stabilize. Verify.

A MORE EFFICIENT WAY TO STABILIZE THE GROUND

icon

1. ASSESS

We evaluate the affected area and identify signs of settlement, soft spots, poor compaction, or subgrade failure.

icon

2. TEST

DCP testing helps determine the density and condition of the soil beneath the surface.

icon

3. PLAN

We develop a targeted injection plan based on the conditions of the site and the support required.

icon

4. INJECT

Polyurethane foam is injected at predetermined depths to fill problem areas and stabilize the surrounding soil.

icon

5. VERIFY

Testing can be performed after the work is complete to help verify the results and confirm the effectiveness of the solution.

KEEP YOUR INFRASTRUCTURE MOVING.

When ground instability threatens your road, railway, parking lot, or project, there may be a better solution than starting over.